Project 75 · Water
Springbrook Stage 4 Residential Development
Our Water team was commissioned by QM Properties Pty Ltd to undertake a Hydraulic Impact Assessment for a residential development.
This assessment was carried out to support the development application of a site subjected to:
Moreton Bay Regional Council (MBRC) Flood hazard overlays
Overland flow paths, and Environmental (waterways) overlays
The development site was a 34.8ha lot with a local creek passing through. It had multiple proposed internal waterway crossings as well as existing hydraulic infrastructure. The scope of the project was to develop, calibrate, and test hydrologic and hydraulic models for the catchment to inform and devise appropriate mitigation strategies.
Figures

In the index
Start a conversation