Project 74 · Environmental & Renewables

Simberi Island Power Station

The Simberi Gold processing plant was upgraded from 700tph to 1,500tph. The upgrade required the installation of new a power stations, crushing, grinding, and flotation circuits.

We provided various services, including: Detailed design of all aspect of the new processing plant

Detailed design of power station (8 x 1.5MW Wartsilla HFO Generators)

On-site construction supervision Plant commissioning

Key Outcomes: Island power supply converted from diesel to heavy fuel oil (HFO)

Successful integration of multiple design teams