Project 11 · Water
Burdekin Dam to Ross River
We prepared costings for a gravity-fed water supply from the Burdekin Dam to the Ross River Dam.
As part of a $1.2 billion project, our team has compiled costing reports including engineering sketches, engineering fees, and subsequent reports.
We are also providing additional engineering support to Local Government’s Joint Water Taskforce, such as:
A review encompassing all relevant engineering documentation associated with bulk water supply options for the Townsville Urban Water Supply
A high-level summary of engineering analysis, options analysis, risks identifications, and preliminary costings
Assistance with scoping of additional engineering assessments
Facilitation of further detailed reviews Image courtesy of the Townsville Bulletin